11/5/2005 3 Brooksville FL, re-attached HS, VS, Elev to rear fuselage following Vegas to FL move, back to working on kit
9/26/2004 2 remove & redo fairing to match to the rear fuselage
9/25/2004 2 form, drill, rivet lower Rudder fairing
9/20/2004 1 sand & rivet VS tip to VS
9/18/2004 0.5 2nd coat on VS
9/17/2004 1.5 fiberglass work on VS tip
8/19/2004 0.5 2nd coat epoxy seal
8/18/2004 1 tip work, epoxy seal
8/17/2004 1 tip work
8/6/2003 1
8/5/2003 1
6/30/2003 1
6/25/2003 1
6/24/2003 2
6/23/2003 1
6/22/2003 1
6/21/2003 4
6/19/2003 1
6/18/2003 4 Rudder
6/15/2003 1 Rudder
6/14/2003 3 Rudder
6/11/2003 2 Rudder
6/8/2003 2 Rudder
6/5/2003 2 Rudder
6/4/2003 1
5/29/2003 1.5 Rudder
5/28/2003 1
5/21/2003 1 Rudder
5/20/2003 1.5
5/19/2003 2
5/18/2003 1
5/16/2003 1
5/15/2003 1
5/13/2003 1
5/12/2003 1
5/9/2003 1
5/8/2003 1
5/7/2003 1 Left Elevator
5/4/2003 1 Left Elevator
5/1/2003 0.5 Right Elevator
5/1/2003 0.5 Left Elevator
4/27/2003 0.5 Left Elevator
4/23/2003 1 Rudder
4/22/2003 1 Left Elevator
4/21/2003 1 DONE - Trim Tab
4/20/2003 1 Trim Tab
4/19/2003 1.5 Trim Tab
4/17/2003 1 Trim Tab
4/16/2003 1 Trim Tab
4/16/2003 3 Left Elevator
4/15/2003 1 Left Elevator
4/11/2003 1 Left Elevator
4/10/2003 1 Left Elevator
4/9/2003 1 Left Elevator
4/8/2003 1.5 Left Elevator
4/2/2003 1 Left Elevator
4/1/2003 1 Right Elevator
3/31/2003 2 Right Elevator
3/30/2003 3 Right Elevator
3/27/2003 2 Right Elevator
3/26/2003 1 Right Elevator
3/26/2003 1 Left Elevator
3/25/2003 0.5 Right Elevator
3/25/2003 0.5 Left Elevator
3/24/2003 0.5 Right Elevator
3/24/2003 2.5 Left Elevator
3/23/2003 2 Right Elevator
3/23/2003 2 Left Elevator
3/20/2003 1 Right Elevator
3/19/2003 1 Right Elevator
3/18/2003 1 Right Elevator
3/17/2003 0.5 Right Elevator
3/13/2003 0.5 Right Elevator
3/12/2003 1 Rudder
3/11/2003 0.5 Rudder
3/11/2003 1 DONE - Horizontal Stabilizer
3/10/2003 1.5 Horizontal Stabilizer
3/8/2003 1 Horizontal Stabilizer
3/7/2003 1 DONE- Vertical Stabilizer
3/7/2003 1 Horizontal Stabilizer
3/6/2003 1 Vertical Stabilizer
3/5/2003 1 Rudder
3/5/2003 0.5 Vertical Stabilizer
3/4/2003 2 Vertical Stabilizer
3/3/2003 1 Vertical Stabilizer
3/2/2003 1.5 Vertical Stabilizer
3/1/2003 1.5 Vertical Stabilizer
2/28/2003 1 Vertical Stabilizer
2/27/2003 1 Vertical Stabilizer
2/26/2003 1 Horizontal Stabilizer
2/25/2003 1 Horizontal Stabilizer
2/24/2003 1 Horizontal Stabilizer
2/23/2003 0.5 Horizontal Stabilizer
2/22/2003 1 Horizontal Stabilizer
2/20/2003 1 Horizontal Stabilizer
2/19/2003 1 Horizontal Stabilizer
2/18/2003 1.5 Horizontal Stabilizer
2/17/2003 1 Horizontal Stabilizer
2/16/2003 1.5 Horizontal Stabilizer
2/15/2003 1.5 Horizontal Stabilizer
2/13/2003 1.5 Horizontal Stabilizer
2/12/2003 1.5 Horizontal Stabilizer
2/11/2003 1.5 Horizontal Stabilizer
2/10/2003 1.5 Horizontal Stabilizer