Dan's RV7a Builder Website

Finish Kit

Date Session Hours Task
9/21/2006 2 trim wheel pants & apply backer strip, coat top cowl with epoxy 50% solution
9/18/2006 1 sand, superfil wheel fairing
9/16/2006 1 sand, superfil wheel fairing
9/13/2006 1 sand, superfil wheel fairing
9/12/2006 1 superfil wheel fairing
9/11/2006 1 attach intersection to wheel fairing with epoxy cloth
9/1/2006 2 attach/rivet wheel to gear fairings and prepare for epoxy molding
9/1/2006 1 remove intersection fairing, prep others
8/31/2006 1 layer epoxy/cloth for wheel to gear intersection fairing
8/30/2006 1 continue with gear & wheel fairing
8/29/2006 1 continue with gear & wheel fairing
8/28/2006 1 continue with gear & wheel fairing
8/27/2006 4 continue with gear & wheel fairing
8/26/2006 2 continue with gear & wheel fairing
8/23/2006 2 jack up main gear, align gear fairings, fill with Great Stuff foam
8/22/2006 1 more prep for main gera alignment
8/21/2006 1 prep for main gear alignment
8/20/2006 3 begin attaching main gear leg fairing
8/19/2006 2 finsih up with the nose gear fairing
8/18/2006 2 continue with the nose gear fairing
8/17/2006 2 mount nose gear bracket and expand cutout for tire…
8/13/2006 4 continue attaching nutplates to wheel attach points & wheel fairingd
8/12/2006 3 fairing bracket work, drill, rivet, attach hinge to gear fairing
8/5/2006 2 attach & rivet gear fairing hinge assy along with nutplates to wheel pants
8/5/2006 3 trim & size gear fairings
7/12/2006 1 begin wheel fairing work
5/14/2006 3 finish sand fwd canopy, apply contact cement to new cushion mat & fwd cabin carpeting
5/2/2006 1 sand upper/lower cowl right join
4/30/2006 1.5 attach platenuts to center cowl attach, coat epoxy on right front cowl join to correct misalignment
4/29/2006 1 more brake fluid fill
4/28/2006 1 recut slot for lower cowl to clear prop
4/23/2006 3 sand cowl & fwd windscreen, adjust lower cowl for prop clearance on removal,
4/22/2006 4 apply uhwm tape to flaps, sand & apply 2nd coat of epoxy to upper & lower cowls & rear emp fairing, attach seat belts
4/21/2006 1 apply epxoy to upper cowl for pinhole coverup
4/20/2006 6 attach blast cooling on baffles, attach lower cowl baffle material to inlet, glass cowl rivet holes
4/19/2006 4 rivet remaining lower cowl piano hinge, complete oil access door, epoxy upper cowl inner scoop
4/17/2006 6 rework & replace lateral cowl piano hinge to new size
3/26/2006 3 build lower cowl hinge bracket
3/22/2006 7 fit upper and lower cowls, drill and ctrsk
3/21/2006 5 Reworked top cowl
2/20/2006 2 spinner cutouts
1/23/2006 1 Cowl fitting…
12/29/2005 0.5 apply sealant to rollbar canopy interior gap
12/28/2005 1 sand forward canopy plexiglass
12/6/2005 1 attach & redrill emp fairing
12/5/2005 1 rear emp fairing adjustment to enable better fit, rework canopy close handles
12/3/2005 2 completed fwf hinge attachments
12/2/2005 3 fabricate shim for fwd fuelage/hinge, drill, deburr, attach hinge & rivet
12/1/2005 2 fabricate & wrinkle paint dummy plate for instrument panel, cut & drill fwd fuselage top hinge assy
11/30/2005 1 reworked lower fwd fuselage hinge, rivet to fuselage
11/29/2005 2 msic finish stuff, drill & debur lower cowl piano hinge
11/28/2005 2 sand canopy areas & othe misc finishin stuff
11/26/2005 4 various assortment of items, sand fwd canopy, rudder, wing, attempt ot bleed brakes, drill 2" hole into firewall, frivet rear canopy to fix bow
11/25/2005 6 various assortment of items, nose gear, canopy, superfill sand….
11/24/2005 1 apply superfill to wing & rudder divot. Recoat front windscreen area
8/27/2005 1 misc canopy adjustments
8/23/2005 1 misc finishing stuff
8/21/2005 3 misc finishing stuff,,, drill right passenger stick & attach with clevis pin, cut foam pads for floorboards
8/20/2005 2 rework emp fairing, countersink, attach missing nutplates
8/18/2005 2 misc finishing stuff
8/17/2005 1 complete new latch fabrication and install
8/16/2005 1.5 fabricate new canopy latch bracket
8/14/2005 1.5 fwd to rear canopy adjustments
7/16/2005 0.5 cut & fit interior vent lines
7/14/2005 1.5 canopy work on rear skirt to close gaps
6/25/2005 2 prep rivet & attach air vents
6/22/2005 3 re-attach elevators/elev push rods, trim emp fairing for fit, adjust baggage panel
6/21/2005 1 misc cleanup up
6/5/2005 1.5 drill routing holes in supports, L&R pass through pitot tubes, remote compass & elt wiring
6/4/2005 5 emp fairing attachment-drill, ctrsink, tap attach points, access plates…
6/3/2005 5.5 attach platenuts - setup & attach rear emp fairing
5/22/2005 3 canopy adjustments…
5/20/2005 1 rework canopy bracket
5/17/2005 1 misc stuff
5/15/2005 0.5 more sanding
5/13/2005 1 more sanding & prep work
5/8/2005 1 more sanding & prep work
5/1/2005 0.5 more stinkin' sanding of front windscreen
4/19/2005 0.5 more sanding
4/9/2005 0.5 reapply cloth & epoxy to front canopy/windscreen area
4/8/2005 2 more sanding, trim canopy top fairing to canopy
4/7/2005 1.5 more sanding…
4/5/2005 1 more sanding…
4/4/2005 1 sand, recoat voids with epoxy/micro balloons
4/3/2005 2 sand, recoat voids with epoxy/micro balloons, separate canopy from front windscreen
4/2/2005 1.5 sand canopy edges, detach canopy, clean up & reapply cloth & epoxy
4/1/2005 1.5 sand, recoat voids with epoxy/micro balloons
3/31/2005 1 sand…
3/30/2005 1 layup & epoxy windscreen over slider
3/29/2005 3 light sand, clean, prep & applepoxy with micro ballons to plexiglass edge. Apply epoxy buildup with cloth to forward windscreen.
3/28/2005 2 attach electrical tape borders to front windscreen, sand & prep border
3/27/2005 2.5 fabricate and attach windscreen retaining clips
3/25/2005 2.5 prep, prime, & finish paint top skin below windscreen before attachment,attach screws & spacers on front windscreen
3/24/2005 1 refabricate tail strobe support bracket
3/22/2005 1 began attaching front windsceern
3/8/2005 0.5 cut 1/4"id tubing and attach to landing gear fuel lines
2/26/2005 0.5 fabricate canopy slide assy using fishing line
2/14/2005 0.5 sand superfill vent area
2/13/2005 1.5 attach uhwm tape to rear canopy assy, sand & superfill side vents
2/12/2005 1 fill & bleed brake lines
2/2/2005 1.5 fabricate & attach lower brake line
1/25/2005 0.5 Attach r side landing gear with bolt, torque…
1/22/2005 1 6-32 tapping of the forward rollbar frame
1/20/2005 1.5 landing gear attachment
1/19/2005 1 landing gear fitting
1/16/2005 0.5 build & attach EXPERIMENTAL logo in bagage panel
1/14/2005 0.5 redo mapbox door
1/14/2005 1.5 assemble nose gear assy
1/13/2005 1 continue assembling nose wheel assy
1/11/2005 1 mount nose wheel & tire assy
1/9/2005 1 completed rear canopy assy
1/8/2005 6 continue fitting rear skirt, rivet to canopy/frame rivet interior to side skirts/frame
1/7/2005 3 continue form, fit rear skirt
1/6/2005 3 trim, form, layup, cut, match drill rear canopy skirts using hole locators
1/5/2005 2 setup & rivet/bolt side skirts & rivet forward canopy to frame
1/4/2005 2 continue final drill, debur, csink canopy skirt, frame & canopy
1/3/2005 1 final drill canopy skirt
1/2/2005 1 finish drill c-791 & deburr…
1/1/2005 2 drill C-791 support to inside canpopy frame
12/28/2004 3 drill supports through canopy, prep C791 with lightening holes, deburr
12/27/2004 3 attach & secure anchor blocks, drill canopy side skirts & braces to canopy frame
12/20/2004 1.5 fabricate & attach the rear canopy anchor blocks.
12/19/2004 1 rivet C-653 strip to top canopy, work on handle
12/18/2004 1 canopy work & handle
12/16/2004 1 modify & attach canopy handle
12/15/2004 2 drill windscreen to rollbar
12/14/2004 1 drill slider roller brackets assy
12/13/2004 1 secure slider rails
12/12/2004 1 rework side rest to attach slider rails
12/11/2004 3 final trim of sliding canopy, trim forward windscreen & size using shims… drill slider rails for final fit
12/10/2004 1 prep work for the canopy side skirts
12/5/2004 4 Canopy drill, countersink, drill C653 top strap
11/28/2004 1 drill mouting holes FWF
11/28/2004 2 %&^*&&^ wheel axle setup, cotter pin though axle…
11/27/2004 3 ^%^(&&* wheel axle setup
11/26/2004 2 wheel axle setup, redo mounting flange for 1/16 separation
11/23/2004 2 fabricate bushings & attach brake mouting plate, wheel fairing bracket
11/22/2004 2 drilling & fitting the supports& brake flange to the landing gear. Plans & Drawings suck here. Worse yet..
11/21/2004 2 setup & initial drilling of the canopy to the slider frame
11/20/2004 1.5 The big Cut. Finish 2nd/last side cuts, rear cuts, & split windscreen-slider cuts. Hurray- No Cracks!
11/20/2004 1.5 assemble main landing gear tires to the split rims
11/18/2004 1.5 repack bearings & prep tires for install
11/14/2004 1 layup canopy & frame, secure with duct tape & mark area around frame for next cut
11/14/2004 2 cut forward & rear side canopy, drill handle hole & sand with 220/400 grit
11/8/2004 1 canopy prep work
11/6/2004 3 canopy frame work
11/5/2004 1 canopy frame work
11/4/2004 1 canopy frame work
11/3/2004 2 canopy frame work
11/2/2004 2 canopy frame work
11/1/2004 1.5 drill & setup roll bar support bar
10/31/2004 1 flush rivet remaining rivets on upper rail where roll bar meets
10/31/2004 3 install & attach roll bar