Dan's
RV7a Builder Website
Firewall Forward
| Date | Session Hours | Task |
| 4/26/2006 | 3 | fabricate new throttle bracket |
| 4/15/2006 | 1 | misc fwf stuff |
| 4/14/2006 | 2 | wrap wiring & secure |
| 4/13/2006 | 4 | misc firewall forward |
| 4/12/2006 | 4.5 | set mixture & throttle cables |
| 4/11/2006 | 2.5 | seal baffling & wire tie fins |
| 4/10/2006 | 4 | misc fwf stuff |
| 4/9/2006 | 6 | relocate oil cooler, final securing of baffling material |
| 4/7/2006 | 7 | fabricate panels & attach platenuts on spinner items |
| 4/5/2006 | 2 | installed prop for spinner setup alignments… |
| 4/4/2006 | 3 | attached rubber seals on baffle panels, almost done finally |
| 4/3/2006 | 6.5 | more baffling, starting to secure final time |
| 4/2/2006 | 2 | more baffling |
| 4/1/2006 | 4 | more baffling, secure lower magneto cables |
| 3/31/2006 | 5 | more baffling, apply epoxy and micro balloons on top cowl |
| 3/30/2006 | 6 | front cowl baffling and FAB |
| 3/29/2006 | 4 | front cowl baffling and cabin heat adapter |
| 3/28/2006 | 4 | cowl baffling |
| 3/27/2006 | 5 | cowl baffling and lower hinge setup |
| 3/25/2006 | 7 | wrap up fuel pump wiring and housing |
| 3/23/2006 | 8 | rework, proseal and rivet upper and lower panels |
| 3/18/2006 | 6 | Complete fuel pump install,Connect 2 GA cables |
| 3/17/2006 | 8 | build/attach fuel pump assy |
| 3/16/2006 | 2.5 | build fuel pump assy housing |
| 3/12/2006 | 7 | baffle work, install oil cooler, build battery cables, safety tie alt, begin lower cowl fitting |
| 3/11/2006 | 5 | baffle work and misc fwf |
| 3/10/2006 | 1 | torque spark plugs. Install headset hooks |
| 3/9/2006 | 2 | build oil cooler attach assy And cut battery cable to size |
| 3/8/2006 | 2.5 | misc fwf stuff |
| 3/7/2006 | 6 | Fwf, fab attach brkt, throttle, fab, heat cabin adjust and attach to bracket, install plugs hand tight |
| 3/5/2006 | 6 | attach egt, cht w connects, heat muff scat tubing, redo fuel overflow line |
| 3/4/2006 | 5 | finish attaching exh system, heat muff… |
| 3/3/2006 | 1.5 | attach exh system |
| 2/28/2006 | 2.5 | Fwf |
| 2/27/2006 | 1.5 | fwf stuff, alternator |
| 2/26/2006 | 7 | fwf, wiring, setup pushrods |
| 2/20/2006 | 5 | fwf, inc mixture support bkt |
| 2/19/2006 | 3 | FWF |
| 2/18/2006 | 4 | FWF |
| 2/17/2006 | 2.5 | oil qk drain, oil p sensor |
| 2/16/2006 | 3 | throttle bracket, oil temp ga |
| 2/15/2006 | 2.5 | More fwf. |
| 2/13/2006 | 1.5 | Throttle … |
| 2/12/2006 | 5 | Misc fwf |
| 2/11/2006 | 7 | Misc fwf |
| 2/10/2006 | 3 | Misc fwf |
| 2/9/2006 | 3.5 | fwf attach platernuts… |
| 2/8/2006 | 1.5 | Fwf stuff |
| 1/27/2006 | 3.5 | Fwf stuff |
| 1/26/2006 | 2 | Fw prep stuff |
| 1/25/2006 | 2 | route wires thru fw, eval lower cowl |
| 1/22/2006 | 6 | Add cotter pins to eng bolts, prep and cut top cowl, drill and attach hinge assy w epoxy and rivets, cut out oil check on cowl, attach camloc to door frame |
| 1/21/2006 | 2.5 | drill prep throttl/mixture fw holes, torque engine bolt! Attach cable. Fwf fasteners |
| 1/15/2006 | 1.5 | Hang the engine w help form Gordo and Nann |
| 12/17/2004 | 1 | attach engine mount |
| 12/10/2004 | 0.5 | rivet doubler & attach solenoid & master relay |
| 12/7/2004 | 0.5 | fabricate new starter & relay attach bracket |
| 12/6/2004 | 0.5 | starter & master relay attachment |
| 12/5/2004 | 1.5 | Fabricate & drill relay doubler & mounting bracket |