Dan's RV7a Builder Website

Firewall Forward

Date Session Hours Task
4/26/2006 3 fabricate new throttle bracket
4/15/2006 1 misc fwf stuff
4/14/2006 2 wrap wiring & secure
4/13/2006 4 misc firewall forward
4/12/2006 4.5 set mixture & throttle cables
4/11/2006 2.5 seal baffling & wire tie fins
4/10/2006 4 misc fwf stuff
4/9/2006 6 relocate oil cooler, final securing of baffling material
4/7/2006 7 fabricate panels & attach platenuts on spinner items
4/5/2006 2 installed prop for spinner setup alignments…
4/4/2006 3 attached rubber seals on baffle panels, almost done finally
4/3/2006 6.5 more baffling, starting to secure final time
4/2/2006 2 more baffling
4/1/2006 4 more baffling, secure lower magneto cables
3/31/2006 5 more baffling, apply epoxy and micro balloons on top cowl
3/30/2006 6 front cowl baffling and FAB
3/29/2006 4 front cowl baffling and cabin heat adapter
3/28/2006 4 cowl baffling
3/27/2006 5 cowl baffling and lower hinge setup
3/25/2006 7 wrap up fuel pump wiring and housing
3/23/2006 8 rework, proseal and rivet upper and lower panels
3/18/2006 6 Complete fuel pump install,Connect 2 GA cables
3/17/2006 8 build/attach fuel pump assy
3/16/2006 2.5 build fuel pump assy housing
3/12/2006 7 baffle work, install oil cooler, build battery cables, safety tie alt, begin lower cowl fitting
3/11/2006 5 baffle work and misc fwf
3/10/2006 1 torque spark plugs. Install headset hooks
3/9/2006 2 build oil cooler attach assy And cut battery cable to size
3/8/2006 2.5 misc fwf stuff
3/7/2006 6 Fwf, fab attach brkt, throttle, fab, heat cabin adjust and attach to bracket, install plugs hand tight
3/5/2006 6 attach egt, cht w connects, heat muff scat tubing, redo fuel overflow line
3/4/2006 5 finish attaching exh system, heat muff…
3/3/2006 1.5 attach exh system
2/28/2006 2.5 Fwf
2/27/2006 1.5 fwf stuff, alternator
2/26/2006 7 fwf, wiring, setup pushrods
2/20/2006 5 fwf, inc mixture support bkt
2/19/2006 3 FWF
2/18/2006 4 FWF
2/17/2006 2.5 oil qk drain, oil p sensor
2/16/2006 3 throttle bracket, oil temp ga
2/15/2006 2.5 More fwf.
2/13/2006 1.5 Throttle …
2/12/2006 5 Misc fwf
2/11/2006 7 Misc fwf
2/10/2006 3 Misc fwf
2/9/2006 3.5 fwf attach platernuts…
2/8/2006 1.5 Fwf stuff
1/27/2006 3.5 Fwf stuff
1/26/2006 2 Fw prep stuff
1/25/2006 2 route wires thru fw, eval lower cowl
1/22/2006 6 Add cotter pins to eng bolts, prep and cut top cowl, drill and attach hinge assy w epoxy and rivets, cut out oil check on cowl, attach camloc to door frame
1/21/2006 2.5 drill prep throttl/mixture fw holes, torque engine bolt! Attach cable. Fwf fasteners
1/15/2006 1.5 Hang the engine w help form Gordo and Nann
12/17/2004 1 attach engine mount
12/10/2004 0.5 rivet doubler & attach solenoid & master relay
12/7/2004 0.5 fabricate new starter & relay attach bracket
12/6/2004 0.5 starter & master relay attachment
12/5/2004 1.5 Fabricate & drill relay doubler & mounting bracket