Dan's
RV7a Builder Website
Wiring
| Date | Session Hours | Task |
| 7/31/2006 | 2 | rework exp2 bus cable to master relay to correct charging issues |
| 5/20/2006 | 7 | panel wiring, build xpdr harness, tie fwd cabin wiring bundles |
| 5/14/2006 | 2 | troubleshoot wiring to locate discharging problem |
| 5/11/2006 | 1 | reinstall alt power to batt & main buss, tie wrap, test |
| 5/10/2006 | 1 | misc ignition troubleshooting |
| 5/8/2006 | 2 | misc wiring & assorted items |
| 5/2/2006 | 1 | route wiring for alternator |
| 4/23/2006 | 4 | build ignition harness, wire magnetos to ignition harness. Test panel output |
| 4/21/2006 | 2 | panel wire for fuel pressure & fuel senders |
| 2/25/2006 | 2 | run fuel tank wires, more tie bundles |
| 2/22/2006 | 2.5 | bundle fwd cabin wires |
| 2/20/2006 | 2 | panel wiring |
| 2/19/2006 | 3 | panel wiring, Coax |
| 1/30/2006 | 2 | Reroute cabin wires ion fwd cabin, enlarge fuel holes in spar attach |
| 12/8/2005 | 1 | label EIS4000 wiring bundle |
| 11/23/2005 | 4 | rewire intercom to comm & test systems to panel install |
| 11/21/2005 | 1 | re setup wing tips, tested the functions of all systems. Intercomm working. Comm has power but no transmit. Need to troubleshoot. |
| 11/20/2005 | 1 | completed the wiring setup to restart the panel & test the comm, ptt & intercom |
| 11/19/2005 | 5 | reinstall connectors for elev trim, perm install of remote compass, add wiring to D sub for OAT, attach wiring to bulhead, cleanup & temp tie wrap all cabin wiring system |
| 11/17/2005 | 1 | reattach tail light strobe following relocation |
| 11/10/2005 | 2 | route & wire dynon harness to panel & remote compass |
| 8/27/2005 | 2 | misc wiring inc Dynon power connections |
| 8/15/2005 | 0.5 | tweek wiring system |
| 8/13/2005 | 0.5 | working on wig/wag flashers |
| 8/10/2005 | 1.5 | install taxi lights & troubleshoot, netx set up wig/wag |
| 8/7/2005 | 2.5 | attach trim connections to D-sub, set & adjust indicator to trim. Cable tie wrap wiring from cabin to rear |
| 7/25/2005 | 1 | setup & test panel trim indicator |
| 7/24/2005 | 4.5 | rewire trim control, wire, setup & test flaps & elevator trim |
| 7/23/2005 | 3 | hookup & test L/R Navs, landing, & strobe lights |
| 7/22/2005 | 1 | we have lights. Hooked up the cabin lights & the tail nav light. It works! 1000 hours today. |
| 7/21/2005 | 2 | attach poly tubing conduit at tail section & rewire tail strobe |
| 7/20/2005 | 1 | rework tail access through rear fuselage to rudder |
| 7/18/2005 | 1 | complete 2 connectors for the strobe assy |
| 7/17/2005 | 2 | run trim indicator wires to trim tab & attach forward D-sub terminals |
| 7/16/2005 | 1.5 | apply D-sub terminals to trim indicators & flap switch |
| 6/27/2005 | 1.5 | misc wiring… |
| 6/25/2005 | 1 | attach strobe connectors to strobe assy |
| 6/4/2005 | 0.5 | setup & attach remote compass using nylon screws |
| 5/26/2005 | 2 | drill firewall prep & run ignition wire harness |
| 5/25/2005 | 2 | build ignition wiring assy |
| 5/23/2005 | 1 | cable tie & apply condiut to rear fusage bundles |
| 3/27/2005 | 2 | complete tail light/strobe bracket & attach to rudder fairing, run cabin light wires |
| 3/23/2005 | 1 | fabricate tail strobe bracket to secure to rudder |
| 3/19/2005 | 5 | drill & mount cable holes & supports to fore & aft sections, rout wires & attach connectors |
| 3/18/2005 | 2.5 | mount wire supports under forward hood & rout hot wires to front terminal strip |
| 3/17/2005 | 2.5 | rout power supply, landing light wires, attach to ground block |
| 3/16/2005 | 2.5 | routing wires, mapped out wiring diagram |
| 3/15/2005 | 2 | attach ground block to firewall, routing wires |
| 3/14/2005 | 1 | continue with wiring… |
| 3/13/2005 | 2.5 | rerun strobe wires to rear of baggage compartment, drill attach access holes, mount strobe power supply |
| 3/10/2005 | 1 | wiring harness work |
| 3/8/2005 | 1.5 | build ground wiring harness |
| 3/6/2005 | 3 | panel wiring |
| 3/2/2005 | 1 | panel wiring |
| 2/28/2005 | 1 | reconnect exp2bus |
| 2/26/2005 | 0.5 | reroute wires for tail lights |
| 2/14/2005 | 0.5 | building strobe wiring harnesses |
| 2/13/2005 | 1 | setup, locate, drill rear strobe light assy |
| 2/12/2005 | 1.5 | open up wingtip holes for strobes & landing light |
| 2/7/2005 | 1 | setting panel control to power source, bad idea --- shorted ribbon fuse on exp2 bus, send back to Control Vision for repair |
| 2/6/2005 | 2 | lights & electrical stuff, mount landing light bracket to led package… |
| 2/5/2005 | 4.5 | solder rectifier boards to LED nav light boards. Cut, drill, cs, rivet nutplates to wing tip in prep for lights, & strobes installation |
| 2/4/2005 | 1.5 | cut rework led boards, drill, dimple, rivet landing light mounts |
| 2/3/2005 | 1.5 | running wires again |
| 2/3/2005 | 1 | lights prep work |
| 2/1/2005 | 1.5 | build harnesses for exp2 bus to terminal |
| 1/26/2005 | 2 | attach ELT to bellcrank support. Drill hole & attach ELT antenna above rear emp deck |
| 9/12/2004 | 2.5 | attach & run wires to control stick terminal |
| 9/11/2004 | 2 | attach platenuts & install battery |
| 9/10/2004 | 1.5 | soldered control stick contacts |
| 9/6/2004 | 1 | more wiring… |
| 9/5/2004 | 3 | continue wiring, set up control stick terminal strip attach & assignments |
| 9/2/2004 | 2 | route wiring, mount transponder antenna |
| 9/1/2004 | 1 | routed wires |
| 8/30/2004 | 1 | cut airframe wiring |
| 8/29/2004 | 1.5 | wiring, vent assy, |